Detailed range of services:
Conformity assessment (essential requirements / Machinery Directive) should be carried out e.g. in case of:
In addition, all lines must be approved for use (minimum requirements / Tool Directive) in the target location (also after relocation or purchase of a production line / machine).
The manufacturer of the machine is not responsible for allowing the machine to work at the place of use.
Significant risks often result from incorrect machine integration.
The added protections may create new risks. A post-retrofitting assessment should be carried out.
Safety system tests, including stop time measurements (run-down), should be performed cyclically.